.png)
Independent Drawing Review
JLS Architects offers independent reviews of construction documents to help reduce the risk of Change Orders and other unforeseen costs.​ Poorly coordinated or incomplete construction drawings often lead to costly project disruptions, and errors discovered in the field are significantly more expensive to correct than those identified during the documentation phase. Our Independent Drawing Review (IDR) service enhances coordination and accuracy, resulting in more reliable construction pricing and reduced project costs. With a cost of less than 1% of the construction budget, IDR provides an average savings of 3-6% in overall construction costs.
How It Works:
-
Send Us Your Documents
Send us the drawings or documents you want us to review.
-
Get a Quote
We'll provide a formal quote. For budgetary purposes, our fee is less than 1% of the construction cost.
-
We Review the Documents
Our experienced team will break down your documents into 18 common categories and review the documents for completeness, constructability, and potential code concerns.
-
You Receive Our Mark-Ups
We provide comments and recommendations for items that typically result in field coordination issues or that may have been overlooked by the Design Team.
-
Your Design Team Makes Changes
Your Design Team incorporates our comments into the drawings.
-
You Get a Better Quality Project!
A higher-quality project is produced while minimizing cost overruns!


Did you know?
-
A study performed by the Construction Industry Institute (CII) found that the correction of design Errors and Omissions impacted the cost of construction an average of 3%.
​
-
The AIA suggests that a typical project can produce up to 7% of the contract's value of change orders.
​
-
As defined by the AIA, contractor contingency is to be used for the contractor's "surprises", not for conditions typically deemed as Errors and Omissions.
​
-
40% of Condominium projects will have an Errors and Omissions claim against the Design Team.
​
-
Owners typically include between 2-5% of the total construction cost to address cost overruns stemming from design and coordination issues.
​
-
Some states (like California and New York) have mandated third-party peer reviews for certain drawing types.​​
Contact us to see if this service is the right fit for your next project.